Completed

Project NameClientHost TypeProject Descriptions / Scope of WorkYearProject Status
Confidential MIKE 2Malaysia ClientFPSODevelop Engineering Definition;
Perform FEED study to update Engineering Definition. Deliverables include: i.e. preliminary PFDs, mechanical equipment identifications, layout, datasheets and etc.; with objective to perform cost estimates for Marine facilities with +/- 15% accuracy
Assure Marine and hull structure layout, its performance to meet CLIENT¡¯s specification, risk, constructability, integration, interfaces, commissioning and start-up issues are identified upfront and are addressed
Confirm that Client¡¯s FEED meet the overall philosophy of fit-for purpose design; that is safe, operable and maintainable
Conduct peer review and discussion to confirm Marine philosophy and design basis in meeting CLIENT¡¯s requirements
2020Completed
Confidential LIMAMalaysia ClientFPSOPerform Engineering Definition of the FPSO up to the battery limit as required by Client. The objective is to achieve a minimum cost, fit-for-purpose design that is safe, operable and maintainable.
CTR develop during this stage include the following:
Review, Design and Develop the following which include
Lines Plan Offset Table of Donor Vessel,
General Arrangement & Capacity Plan
Global Strength Analysis - Initial Scantling and Total Strength Assessment
Electrical System Design and Bulk MTO (Preliminary)
Instrumentation & Telecommunication System Design & Bulk MTO ( Preliminary)
Accommodation Design
Intact Stability Report and Stability Model
Weight Control Report
2020Completed
F81 Module Hull AnalysisWS Engineering & Fabrication Pte LtdFPSO ADOLOStrength and Fatigue Analysis for F81 Module subject to new Piping Module (M26)¡¯s additional reaction load
Strength and Fatigue Analysis for Pipe Supports from Fr. 70 to Fr. 88, EL. 34,625 at Central Pipe Rack area for 5 additional Pipe Lines
Re-Analysis of Phase 2 Riser Balcony
2020Completed
FPSO CatcherBW OffshoreFPSOKey Structural Analysis Work
Design Drawing
2018Completed
FPSO AdoloBW OffshoreFPSOGlobal Fatigue Analysis
Moonpool Area Fatigue Analysis
Crane Pedestal Modification
Phase 1 Riser Porch Modification Design & Analysis
Phase 2 Riser Porch Design & Analysis
Various Engineering Works
Phase 2 Engineering Works
2018Completed
FSO BarakudaSoechi LinesFSOMarine, Hull and Accommodation Scope2018Completed
DDKG-2 DrillshipKim Heng Offshore and Marine Holdings LimitedDrill ShipVarious Modification Engineering
Master bushing cradle design/analysis
Beacon recovery frame design/analysis
Spider cap design/analysis
2018Completed
CJ46-X100-D (Hull No. N000410M)CIMOEJackup RigDetail Design Engineering for all disciplines
Testing and Commissioning procedure
Construction Technical Support
Production Design Support
2018Completed